The EU is rolling out DPP requirements. Construction materials including natural stone are expected to require Digital Product Passports by 2027-2028. Full rollout expected by 2030. Most quarries are not even close to ready. You will be.
DPP Regulations Are Coming.
You Are Already Ready.
Every stone sold in the EU will need a Digital Product Passport. The law is already written. The deadlines are set. Most quarries have not started. Noria captures the data you need through your normal operations.
Now
DPP Ready
Not 2030
Auto
Data Points
From your quarry records
PDF + API
Export Formats
Any market
Digital Product Passport
EU ESPR Compliant
Material
Volakas White Marble
Quarry
Noria Quarry, Drama, Greece
Block ID
BLK-0891
Extraction Date
14 Nov 2024
GPS Coordinates
41.1234° N, 24.1567° E
Petrographic Class
Crystalline Marble (CaCO3 98.4%)
Carbon Footprint
18.4 kg CO2e / tonne
Certifications
CE Mark · ISO 14001 · EPD
Every Field the EU Requires. Populated From Your Quarry Data.
The DPP is not a new document you write. It is data you are already generating. Noria captures it at the source and assembles the passport automatically.
Origin Tracking
Where was this stone quarried? Every block has an answer. GPS coordinates of the extraction face, quarry name, region, country — embedded in the passport automatically.
GPS-level precisionMaterial Composition
Petrographic data, mineral content, physical properties. Upload lab test results and certifications. They attach to every block from that extraction zone permanently.
Lab data includedEnvironmental Performance
Carbon footprint from extraction to delivery. Fuel used in cutting, water consumption, transport emissions — calculated from your existing fleet and production data.
Scope 1, 2 & 3 readyQR Passport
Scan a QR code, see the complete stone history. Each block, slab, or tile batch gets a unique QR that links to its live digital passport. Print it on delivery documents.
Scan-to-verifyCompliance Dashboard
See which products are DPP-ready at a glance. Your inventory view shows a DPP completeness score for every item. Fix gaps before an order arrives, not during.
Completeness scoresExport Documentation
Generate DPP documents for any market. PDF for physical delivery. Structured data export for digital integration. Formatted for EU regulation requirements.
One-click exportThe Clock Is Already Running.
The EU Ecodesign for Sustainable Products Regulation is law. Product categories are being added every year. Natural stone is in the roadmap.
DPP already mandatory for batteries sold in the EU. Electronics to follow. The framework is live.
Textiles and fashion brands required to provide product passports. Scope widens.
Products used in construction — including stone — enter the mandatory scope. This is where quarries need to be ready.
DPP expected to be fully mandatory for natural stone sold in the EU. Most quarries are not close to ready. You will be.
Most quarries have not started.
Getting DPP-ready from scratch takes 12-18 months of data collection, system setup, and certification gathering. Starting now means you will be ready before your competitors are even thinking about it.
Key deadline: 2027-2028
Construction materials are expected to enter DPP scope within 2 years. That is your next tender cycle. That is your next major contract. Start collecting now.
DPP Is Not Optional. How You Prepare Is.
There are three approaches to DPP compliance: build it into your operations now, pay consultants to manually prepare reports, or wait and scramble when the deadline arrives.
Competitors
- DPP not in their roadmap — they are chasing basic features
- No quarry-native data model to populate a passport from
- Would need to build a new module from scratch
- No block traceability to link material to origin
- Carbon calculations would require manual entry
- Not ready for 2027. Not thinking about 2030.
Manual / Consultants
- A consultant can write a DPP report — once, for one product
- Does not scale to thousands of blocks and batches
- Costs EUR 5,000–20,000 per product category to prepare
- Cannot update passports when new data arrives
- No QR codes, no live verification, no digital delivery
- Expires the moment your stone changes or regulations shift
Noria DPP
- DPP built into the platform — not bolted on later
- Your quarry data already populates 80% of the passport
- Every block gets a passport automatically from day one
- Traceability links every tile and slab back to extraction
- Carbon calculated from your own fleet and production records
- Ready now. Compliant by 2027. Ahead by 2030.
2030
Full EU DPP Deadline
6
Passport Data Modules
0
Extra Systems Needed
1
Scan to Verify
2030
Full EU DPP Deadline
6
Passport Data Modules
0
Extra Systems Needed
1
Scan to Verify
Questions About Digital Product Passports.
Start now
Be DPP-Ready
Before Everyone Else.
See how Noria builds your Digital Product Passport automatically from your quarry operations. No extra systems. No consultants. No panic in 2027.
No commitment required. See what your DPP looks like with your own data.